Approving Packaging Samples Before a Bulk Order
English → Filipino
Your turn: interpret it aloud in the other language.
Start this dialogue free →Procurement adviser (speaking English) and Business owner (speaking Filipino) talk through “Approving Packaging Samples Before a Bulk Order”. You interpret both ways — English into Filipino, and Filipino into English — one segment at a time, exactly as in the CCL test.
NAATI CCL Filipino practice test on naaticcl.com: 165 dialogues and 82 two-dialogue mock tests; transcripts and model answers free to read, plus a free PDF. First two dialogues AI-marked free (no card; email sign-in for the score, out of 45 per dialogue or 90 for a full mock), then A$9 per full mock or from A$19 / 14 days. Updated 6 Nov 2026. Run by PTE Study Pty Ltd (Australia), independent of NAATI. All Filipino practice · NAATI CCL Filipino mock test online (82 sets) · Basahin sa Filipino · Practice websites compared
Read it first if you like, then practise it cold: the recording plays one segment, you interpret, the next segment plays. Marking shows, segment by segment, what you kept, left out or changed.
Full transcript with model answers
Under each segment: a model interpretation, the information points an examiner checks, and the easiest thing to miss. Try the segment yourself first, then open it. The model is one good way to say it; other wordings that keep every point score just as well.
Before you order the packaging, Mr Dalisay, let's agree on a written approval process for the three sample designs your supplier sent to Engadine.
Model answer and marking points
Bago kayo umorder ng packaging, Ginoong Dalisay, magkasundo muna tayo sa isang proseso ng nakasulat na pag-apruba para sa tatlong sample na disenyo na ipinadala ng supplier ninyo sa Engadine.
What an examiner checks here:
- Before ordering packaging
- Addressed to Mr Dalisay
- Agree on a written approval process
- Three sample designs
- Supplier sent samples to Engadine
Easy to miss: The written approval process must be agreed on before ordering packaging.
Nakuha ko na po ang tatlong sample. Maganda ang pagkakaimprenta, pero hindi ko pa nasusubukang isuot ang mga sleeve sa kahon ng produkto ko.
Model answer and marking points
I've received all three samples. The printing looks good, but I haven't tried fitting the sleeves onto my product boxes yet.
What an examiner checks here:
- All three samples received
- Printing looks good
- Has not yet tried fitting sleeves onto product boxes
Easy to miss: The sleeves have not yet been tested for fit.
Your turn — don't read the rest yet. Hear this dialogue at native speed and interpret each segment aloud; AI marks what you kept, left out or changed, segment by segment. Your first two full dialogues are marked free.
Interpret it aloud now →We'll record the design name, dimensions, material and print colours for each sample. Which features matter most when you compare them with your actual product?
Model answer and marking points
Itatala natin ang pangalan ng disenyo, mga sukat, materyal at mga kulay ng pagkakaimprenta ng bawat sample. Aling mga katangian ang pinakamahalaga sa inyo kapag ikinukumpara ninyo ang mga ito sa aktuwal ninyong produkto?
What an examiner checks here:
- Record details for each sample
- Design name and dimensions
- Material and print colours
- question: Which features matter most when comparing samples with the actual product?
Easy to miss: Keep the question about which features matter most as a question.
Dapat po madaling isuot sa kahon ang sleeve, pero hindi maluwag. Ayoko ring madaling mapunit. Medyo madilim ang kulay ng logo sa isang sample.
Model answer and marking points
The sleeve should slide easily onto the box, but it shouldn't be loose. I also don't want it to tear easily. The logo colour is a little dark on one sample.
What an examiner checks here:
- Sleeve must slide easily onto box
- Sleeve must not be loose
- Must not tear easily
- Logo colour is a little dark on one sample
Easy to miss: The sleeve must fit easily without being loose.
Then your checklist should include fit, strength and colour accuracy. Photograph any defects, and ask the supplier to confirm proposed changes before producing another sample.
Model answer and marking points
Kung ganoon, dapat kasama sa checklist ninyo ang pagkakasuot sa kahon, tibay at katumpakan ng kulay. Kunan ninyo ng litrato ang anumang depekto, at hilingin sa supplier na kumpirmahin ang mga iminungkahing pagbabago bago gumawa ng panibagong sample.
What an examiner checks here:
- Checklist includes fit
- Checklist includes strength and colour accuracy
- Photograph any defects
- Ask supplier to confirm proposed changes
- Confirmation before producing another sample
Easy to miss: The supplier must confirm proposed changes before making another sample.
Sige po, kukunan ko ng litrato ang mga problema. Balak kong umorder ng anim na raang sleeve. Kapag napili ko na ang disenyo, puwede na ba nilang gawin lahat?
Model answer and marking points
All right, I'll take photos of the problems. I'm planning to order six hundred sleeves. Once I've chosen the design, can they go ahead and make all of them?
What an examiner checks here:
- Will photograph the problems
- Plans to order 600 sleeves
- question: Can supplier produce all sleeves once the design is chosen?
Easy to miss: The planned order is 600 sleeves, and permission to produce them is a question.
Keep sample approval separate from order confirmation. Your written approval should identify the accepted sample, but production must wait until you explicitly authorise the bulk order.
Model answer and marking points
Ihiwalay ninyo ang pag-apruba sa sample sa pagkumpirma ng order. Dapat tukuyin sa nakasulat ninyong pag-apruba kung aling sample ang tinanggap ninyo, pero kailangang maghintay ang produksyon hanggang tahasan ninyong pahintulutan ang maramihang order.
What an examiner checks here:
- Keep sample approval separate from order confirmation
- Written approval identifies accepted sample
- Production must wait
- Explicit authorisation of bulk order required
Easy to miss: Approving a sample does not authorise production of the bulk order.
Malinaw po. Puwede bang sa ikalabinsiyam ng Nobyembre natin suriin ang tatlong sample? Dadalhin ko ang mga kahon para masubukan natin kung maayos ang sukat.
Model answer and marking points
That's clear. Could we review the three samples on the nineteenth of November? I'll bring the boxes so we can test whether they fit properly.
What an examiner checks here:
- Understands the explanation
- question: Review all three samples on 19 November?
- Will bring boxes
- Purpose is to test proper fit
Easy to miss: 19 November is a requested review date, not a confirmed appointment.
I'll note your requested review date of 19 November. Please bring the samples and boxes; we'll check them together and record any remaining changes before approval.
Model answer and marking points
Itatala ko ang hinihiling ninyong petsa ng pagsusuri na ika-19 ng Nobyembre. Pakidala ang mga sample at mga kahon; sabay natin silang susuriin at itatala ang anumang natitirang pagbabago bago aprubahan.
What an examiner checks here:
- Notes requested review date of 19 November
- Bring samples and boxes
- Check them together
- Record remaining changes before approval
Easy to miss: Both the samples and the boxes must be brought to the review.
Salamat po. Kung sabihin ng supplier na kailangan nilang palitan ang materyal pagkatapos kong pumirma, dapat ba akong humingi ulit ng sample bago sila magsimula?
Model answer and marking points
Thank you. If the supplier says they need to change the material after I've signed, should I ask for another sample before they start?
What an examiner checks here:
- Conditional on supplier needing to change material
- Material change after signing
- question: Request another sample before supplier starts?
Easy to miss: The material change happens after signing, but the new sample is requested before production starts.
Yes, require a new sample and written approval if the material changes. I'll draft the checklist and approval form for you to discuss with your supplier.
Model answer and marking points
Oo, humingi kayo ng bagong sample at hingin na may nakasulat na pag-apruba kung magbabago ang materyal. Gagawa ako ng draft ng checklist at form ng pag-apruba para mapag-usapan ninyo ng supplier ninyo.
What an examiner checks here:
- If material changes, require a new sample
- Written approval also required
- Will draft checklist
- Will draft approval form
- Documents for discussion with supplier
Easy to miss: A material change requires both a new sample and written approval.
Sige po. Hihintayin ko ang draft ninyo. Itatabi ko rin ang aprubadong sample para may mapagkumparahan kami pagdating ng maramihang order.
Model answer and marking points
All right. I'll wait for your draft. I'll also keep the approved sample so we have something to compare the bulk order with when it arrives.
What an examiner checks here:
- Will wait for the draft
- Will retain approved sample
- Use sample for comparison when bulk order arrives
Easy to miss: The approved sample is kept as a reference for checking the delivered bulk order.
Practise it
Reading a transcript is not interpreting. The practice room on this site plays each segment at native speed, records you, and marks the information you transferred against the same categories examiners use — omissions, distortions, insertions — so you know where the marks went. Your first two full dialogues are marked free.
Start this dialogue →More Filipino dialogues
Same topic · Business
Filipino CCL: practice test, vocabulary, test dates
How the test works
Continue with the NAATI CCL Filipino practice test: 165 dialogues, 82 mock tests.
Practice dialogue written to the CCL specification (two speakers, segments of 35 words or fewer, about 300 words). It is a practice text, not a NAATI test paper, and the AI score is this site's estimate, not a NAATI result. All Filipino dialogues · All languages