Preparing a Renovation Access and Dust-Control Proposal

Arabic ↔ EnglishHousing12 segments ≈359 wordsSegments of 35 words or fewer

English → العربية

Start this dialogue free →

Strata manager (speaking English) and Apartment owner (speaking Arabic) talk through “Preparing a Renovation Access and Dust-Control Proposal”. You interpret both ways — English into Arabic, and Arabic into English — one segment at a time, exactly as in the CCL test.

NAATI CCL Arabic practice test on naaticcl.com: 343 dialogues and 171 two-dialogue mock tests; transcripts and model answers free to read, plus a free PDF. First two dialogues AI-marked free (no card; email sign-in for the score, out of 45 per dialogue or 90 for a full mock), then A$9 per full mock or from A$19 / 14 days. Updated 6 Nov 2026. Run by PTE Study Pty Ltd (Australia), independent of NAATI. All Arabic practice · NAATI CCL Arabic mock test online (171 sets) · اقرأ بالعربية · Practice websites compared

Read it first if you like, then practise it cold: the recording plays one segment, you interpret, the next segment plays. Marking shows, segment by segment, what you kept, left out or changed.

Full transcript with model answers

Under each segment: a model interpretation, the information points an examiner checks, and the easiest thing to miss. Try the segment yourself first, then open it. The model is one good way to say it; other wordings that keep every point score just as well.

SEGMENT 1 · ENGLISH · 24 WORDS
Strata manager

Before we submit your renovation proposal for review, Ms Haddad, let's clarify access arrangements for your apartment in Fairfield. What work are you planning?

Model answer and marking points

قبل ما نقدّم مقترح التجديد للمراجعة، يا سيدة حداد، خلّينا نوضّح ترتيبات الدخول لشقتك في فيرفيلد. شو الشغل اللي ناوية تعمليه؟

What an examiner checks here:

  • Clarify apartment access arrangements before submitting the renovation proposal for review
  • Resident addressed as Ms Haddad
  • Apartment in Fairfield
  • question: What renovation work is planned?

Easy to miss: The proposal is being submitted for review, not approved.

SEGMENT 2 · ARABIC · 30 WORDS
Apartment owner

أنا ناوية أغير بلاط المطبخ، والشغل المقترح مدته أربعة أيام، يبدأ من السابع من ديسمبر. العمال رح يستخدموا ممرين مشتركين للوصول للشقة ونقل المواد.

Model answer and marking points

I'm planning to replace the kitchen tiles. The proposed work will take four days, starting on the seventh of December. The workers will use two shared corridors to reach the apartment and move materials.

What an examiner checks here:

  • Replace the kitchen tiles
  • Proposed work duration: four days
  • Proposed start: 7 December
  • Workers will use two shared corridors
  • Corridors used to reach the apartment and transport materials

Easy to miss: Keep the four-day duration separate from the proposed start date of 7 December.

Your turn — don't read the rest yet. Hear this dialogue at native speed and interpret each segment aloud; AI marks what you kept, left out or changed, segment by segment. Your first two full dialogues are marked free.

Interpret it aloud now →
SEGMENT 3 · ENGLISH · 26 WORDS
Strata manager

Could you mark both shared corridors on a plan, showing the route for materials and clear access for residents? We'll also need details of protective coverings.

Model answer and marking points

ممكن تحدّدي الممرّين المشتركين على مخطط، وتوضّحي عليه مسار نقل المواد وكيف رح يضلّ طريق السكان سالك؟ ورح نحتاج كمان تفاصيل عن الأغطية الواقية.

What an examiner checks here:

  • question: Mark both shared corridors on a plan
  • Show the materials transport route
  • Show clear access for residents
  • Details of protective coverings also required

Easy to miss: Both shared corridors must appear on the plan, with clear access for residents.

SEGMENT 4 · ARABIC · 32 WORDS
Apartment owner

رح أوضح الممر من المدخل للمصعد، والممر من المصعد لباب شقتي. كنت مفكرة بغطاء بلاستيك عادي، بس خايفة يتحرك مع عربات نقل البلاط ويسبب انزلاق.

Model answer and marking points

I'll show the corridor from the entrance to the lift, and the corridor from the lift to my apartment door. I was thinking of ordinary plastic sheeting, but I'm worried it might shift under the trolleys carrying the tiles and cause someone to slip.

What an examiner checks here:

  • Show corridor from entrance to lift
  • Show corridor from lift to apartment door
  • Initially considered ordinary plastic sheeting
  • Concern that tile transport trolleys could shift the sheeting
  • Shifted sheeting could cause slipping

Easy to miss: The plastic sheeting might move under the trolleys; this is a concern, not an incident that has already happened.

SEGMENT 5 · ENGLISH · 24 WORDS
Strata manager

You could compare adhesive film, reusable mats, and rigid boards. How would each protect the corridor floors, and what would prevent slipping or tripping?

Model answer and marking points

ممكن تقارني بين الفيلم اللاصق، والحصائر القابلة لإعادة الاستخدام، والألواح الصلبة. كيف كل خيار رح يحمي أرضيات الممرات، وشو اللي رح يمنع الانزلاق أو التعثّر؟

What an examiner checks here:

  • Compare adhesive film, reusable mats and rigid boards
  • question: How would each option protect corridor floors?
  • question: What would prevent slipping or tripping?

Easy to miss: Keep slipping and tripping as two distinct hazards.

SEGMENT 6 · ARABIC · 44 WORDS
Apartment owner

الفيلم اللاصق بيحمي الأرض من الغبار وما بيتحرك إذا تركب صح، والحصائر بتحمي من الخدوش ولازم تكون مانعة للانزلاق، والألواح بتحمي الأرض أثناء نقل البلاط الثقيل بس لازم تتثبت حوافها. أنا أميل للألواح.

Model answer and marking points

Adhesive film protects the floor from dust and stays in place if it's installed properly. Mats protect against scratches and need to be non-slip. Boards protect the floor when heavy tiles are being moved, but their edges need to be secured. I'm leaning towards boards.

What an examiner checks here:

  • Adhesive film protects the floor from dust
  • Film stays in place if correctly installed
  • Mats protect against scratches and must be non-slip
  • Boards protect the floor during transport of heavy tiles
  • Board edges must be secured
  • Preference for boards

Easy to miss: Each covering has a different benefit and condition; do not mix them up.

SEGMENT 7 · ENGLISH · 25 WORDS
Strata manager

For dust control, we could consider sealed barriers, suitable extraction, and daily corridor cleaning. Who would check the coverings and deal with any residents' concerns?

Model answer and marking points

للتحكّم بالغبار، ممكن نفكّر بحواجز محكمة الإغلاق، وشفط مناسب للغبار، وتنظيف الممرات يومياً. مين رح يفحص الأغطية ويتابع أي مخاوف عند السكان؟

What an examiner checks here:

  • Consider sealed barriers for dust control
  • Consider suitable dust extraction
  • Consider daily corridor cleaning
  • question: Who will check the coverings and address residents' concerns?

Easy to miss: Dust extraction means removing dust, not simply ventilating the area.

SEGMENT 8 · ARABIC · 38 WORDS
Apartment owner

المقاولة المسؤولة عن الشغل رح تفحص التغطية كل يوم وتتابع أي شكوى، وأنا رح أكون متاحة للتواصل. ورح أطلب منها توضح بالمقترح كيف رح تعزل المطبخ وتسحب الغبار وتنظف الممرات.

Model answer and marking points

The contractor responsible for the work will check the coverings every day and follow up on any complaints, and I'll be available to contact. I'll ask her to explain in the proposal how she'll seal off the kitchen, extract the dust and clean the corridors.

What an examiner checks here:

  • Female contractor responsible for the work
  • Contractor will inspect coverings daily and follow up on any complaints
  • Resident will be available for contact
  • Ask contractor to explain kitchen isolation in the proposal
  • Proposal to explain dust extraction
  • Proposal to explain corridor cleaning

Easy to miss: The contractor will carry out the daily checks; the resident will be available for contact.

SEGMENT 9 · ENGLISH · 26 WORDS
Strata manager

Add your contractor's contact details and proposed delivery times. Submitting this information does not mean approval; the building review may identify changes or require further information.

Model answer and marking points

أضيفي بيانات التواصل مع المقاولة ومواعيد التوصيل المقترحة. تقديم هالمعلومات ما بيعني الموافقة؛ مراجعة إدارة المبنى ممكن تبيّن ضرورة إجراء تعديلات أو تقديم معلومات إضافية.

What an examiner checks here:

  • Add contractor's contact details
  • Add proposed delivery times
  • Submitting information does not mean approval
  • Building review may identify necessary changes
  • Building review may require further information

Easy to miss: Submitting the information does not constitute approval.

SEGMENT 10 · ARABIC · 30 WORDS
Apartment owner

أكيد، رح أضيف رقمها ومواعيد التوصيل المقترحة. أنا لسا ما أكدت الحجز معها، وفاهمة إن موعد البداية ممكن يتغير حسب نتيجة المراجعة والموافقات المطلوبة.

Model answer and marking points

Of course, I'll add her phone number and the proposed delivery times. I haven't confirmed the booking with her yet, and I understand that the start date may change depending on the review outcome and the required approvals.

What an examiner checks here:

  • Add contractor's phone number
  • Add proposed delivery times
  • Booking with contractor not yet confirmed
  • Start date may change
  • Timing depends on review outcome and required approvals

Easy to miss: The booking has not yet been confirmed, and the start date remains conditional.

SEGMENT 11 · ENGLISH · 25 WORDS
Strata manager

That's right. Mark the start date as proposed, attach the corridor plan and covering comparison, then send the complete proposal to our office for review.

Model answer and marking points

صحيح. اكتبي إن تاريخ البداية مقترح، وأرفقي مخطط الممرات ومقارنة الأغطية، وبعدين ابعتي المقترح كامل لمكتبنا للمراجعة.

What an examiner checks here:

  • Mark start date as proposed
  • Attach corridor plan
  • Attach covering comparison
  • Send complete proposal to the office for review

Easy to miss: The start date must be labelled as proposed, not confirmed.

SEGMENT 12 · ARABIC · 35 WORDS
Apartment owner

تمام، رح أجهز المقارنة والمخطط وأرسل المقترح للمكتب. وما رح أبدأ الشغل إلا بعد ما نحصل على الموافقات المطلوبة ونتفق على ترتيبات الدخول. وإذا احتجنا نغير الموعد، بنغيره.

Model answer and marking points

All right, I'll prepare the comparison and the plan and send the proposal to the office. I won't start the work until we've obtained the required approvals and agreed on the access arrangements. If we need to change the date, we'll change it.

What an examiner checks here:

  • Prepare comparison and plan
  • Send proposal to the office
  • Will not start work until required approvals are obtained
  • Access arrangements must also be agreed before work starts
  • Will change the date if necessary

Easy to miss: Both required approvals and agreed access arrangements are conditions for starting work.

Practise it

Reading a transcript is not interpreting. The practice room on this site plays each segment at native speed, records you, and marks the information you transferred against the same categories examiners use — omissions, distortions, insertions — so you know where the marks went. Your first two full dialogues are marked free.

Start this dialogue →

Get an email when new Arabic CCL test dates appear

We check every 2 hours. NAATI updates its list about once a day, so this is not a live seat alert. One email to confirm, then one per change, nothing else. Stop any time in one tap.

More Arabic dialogues

Same topic · Housing

Arabic CCL: practice test, vocabulary, test dates

How the test works

Continue with the NAATI CCL Arabic practice test: 343 dialogues, 171 mock tests.

Practice dialogue written to the CCL specification (two speakers, segments of 35 words or fewer, about 300 words). It is a practice text, not a NAATI test paper, and the AI score is this site's estimate, not a NAATI result. All Arabic dialogues · All languages