Choosing a Replacement Driveway
English → فارسی
Your turn: interpret it aloud in the other language.
Start this dialogue free →Estimator (speaking English) and Homeowner (speaking Persian) talk through “Choosing a Replacement Driveway”. You interpret both ways — English into Persian, and Persian into English — one segment at a time, exactly as in the CCL test.
NAATI CCL Persian practice test on naaticcl.com: 349 dialogues and 174 two-dialogue mock tests; transcripts and model answers free to read, plus a free PDF. First two dialogues AI-marked free (no card; email sign-in for the score, out of 45 per dialogue or 90 for a full mock), then A$9 per full mock or from A$19 / 14 days. Updated 6 Nov 2026. Run by PTE Study Pty Ltd (Australia), independent of NAATI. All Persian practice · NAATI CCL Persian mock test online (174 sets) · به فارسی بخوانید · Practice websites compared
Read it first if you like, then practise it cold: the recording plays one segment, you interpret, the next segment plays. Marking shows, segment by segment, what you kept, left out or changed.
Full transcript with model answers
Under each segment: a model interpretation, the information points an examiner checks, and the easiest thing to miss. Try the segment yourself first, then open it. The model is one good way to say it; other wordings that keep every point score just as well.
For your Bankstown property, I’ve measured the driveway at forty-five square metres. Before I prepare the quote, would you prefer concrete again or consider paving stones?
Model answer and marking points
برای ملک شما در بنکستاون، مسیر ماشینرو رو اندازه گرفتم؛ چهلوپنج متر مربعه. قبل از اینکه برآورد قیمت رو آماده کنم، ترجیح میدین دوباره بتن باشه یا سنگفرش رو هم در نظر میگیرین؟
What an examiner checks here:
- Property in Bankstown
- Driveway measured at 45 square metres
- Before preparing the quote
- question: concrete again or consider paving stones?
Easy to miss: The measurement is 45 square metres, not 45 metres.
ترجیح میدم دوباره بتن باشه، چون بودجهم محدوده. فقط نمیخوام مثل قبلی ترک بخوره. موقع بارون هم آب جلوی گاراژ جمع میشه. اون رو هم میتونین درست کنین؟
Model answer and marking points
I’d prefer concrete again because my budget is limited. I just don’t want it to crack like the old one. Water also pools in front of the garage when it rains. Can you fix that too?
What an examiner checks here:
- Prefers concrete again
- Limited budget
- Does not want cracking like the old driveway
- Rainwater pools in front of the garage
- question: can the water pooling also be fixed?
Easy to miss: Keep both concerns: cracking and water pooling in front of the garage.
Your turn — don't read the rest yet. Hear this dialogue at native speed and interpret each segment aloud; AI marks what you kept, left out or changed, segment by segment. Your first two full dialogues are marked free.
Interpret it aloud now →For this driveway, I suggest plain concrete with a textured finish for grip. We can also adjust the slope to direct rainwater away from your garage.
Model answer and marking points
برای این مسیر ماشینرو، بتن ساده با سطح بافتدار پیشنهاد میکنم تا لیز نباشه. شیبش رو هم میتونیم تنظیم کنیم تا آب بارون رو از گاراژ شما دور کنه.
What an examiner checks here:
- Recommends plain concrete for this driveway
- Textured finish for grip
- Can also adjust the slope
- Direct rainwater away from the garage
Easy to miss: A textured finish provides grip, and the slope directs water away from the garage.
خوبه، فقط سطحش اونقدر زبر نباشه که تمیز کردنش سخت بشه. میخوام ظاهر سادهای داشته باشه. هزینهٔ کل کار، با برداشتن بتن قبلی، چقدر میشه؟
Model answer and marking points
That sounds good, but I don’t want the surface so rough that it’s hard to clean. I want it to look simple. How much will the whole job cost, including removing the old concrete?
What an examiner checks here:
- Proposal sounds good
- Surface must not be so rough that cleaning is difficult
- Wants a simple appearance
- question: total cost including removal of old concrete?
Easy to miss: The customer wants some texture, but not enough roughness to make cleaning difficult.
The written quote is six thousand eight hundred dollars, including removal of the old concrete, preparation, materials and labour. Decorative colouring would cost extra.
Model answer and marking points
مبلغ برآورد کتبی شش هزار و هشتصد دلاره و شامل برداشتن بتن قبلی، آمادهسازی، مصالح و دستمزده. رنگآمیزی تزئینی هزینهٔ جداگانه داره.
What an examiner checks here:
- Written quote is $6,800
- Includes removal of old concrete
- Includes preparation
- Includes materials and labour
- Decorative colouring costs extra
Easy to miss: Decorative colouring is extra, not included in the $6,800.
پس همون بتن ساده رو انتخاب میکنم. شش هزار و هشتصد دلار برای کل کار قابل قبوله. کار چند روز طول میکشه و از کی میتونم ماشین رو بیارم تو؟
Model answer and marking points
Then I’ll go with plain concrete. Six thousand eight hundred dollars for the whole job is acceptable. How many days will the work take, and when can I drive my car onto the driveway?
What an examiner checks here:
- Chooses plain concrete
- Accepts $6,800 for the whole job
- question: how many days will the work take?
- question: when can the car use the driveway?
Easy to miss: Keep the work duration and the time before car access as two separate questions.
We expect three days of work, weather permitting. You’ll need to keep cars off the driveway for seven days from the pour to let it harden.
Model answer and marking points
انتظار داریم کار سه روز طول بکشه، البته اگه هوا اجازه بده. از روز بتنریزی باید تا هفت روز ماشین روی مسیر ماشینرو نیارین تا بتن سفت بشه.
What an examiner checks here:
- Expected work duration is three days
- Weather permitting
- Keep cars off the driveway for seven days
- Seven days counted from the concrete pour
- Allows concrete to harden
Easy to miss: The seven days start from the pour, not from completion of the work.
یعنی کار سه روزهست، ولی از روز بتنریزی باید هفت روز ماشین رو بیرون پارک کنم. مشکلی نیست. توی این مدت میتونم پیاده از مسیر کناری به در خونه برسم؟
Model answer and marking points
So the work takes three days, but I need to park my car outside for seven days from the day the concrete is poured. That’s fine. During that time, can I walk along the side path to get to my front door?
What an examiner checks here:
- Confirms three days of work
- Car parked outside for seven days
- Seven days start on the day of the pour
- Accepts the arrangement
- question: pedestrian access to the front door via the side path during that time?
Easy to miss: Preserve the question about walking access via the side path.
We can leave the side path open for pedestrians and mark off the work area. Please keep children and pets away until we confirm access is safe.
Model answer and marking points
میتونیم مسیر کناری رو برای رفتوآمد پیاده باز بذاریم و محدودهٔ کار رو علامتگذاری کنیم. لطفاً بچهها و حیوانات خونگی رو دور نگه دارین تا ما تأیید کنیم که رفتوآمد امنه.
What an examiner checks here:
- Can keep the side path open for pedestrians
- Can mark off the work area
- Keep children and pets away
- Restriction lasts until the contractor confirms access is safe
Easy to miss: Access must be confirmed safe by the contractor before children and pets are allowed near.
باشه، گربهم رو هم داخل خونه نگه میدارم. اگه پنجشنبه شروع کنین، میتونم خونه باشم. قبل از قطعی کردنش، میخوام برآورد کتبی رو بخونم. پنجشنبه وقت دارین؟
Model answer and marking points
Okay, I’ll keep my cat indoors too. If you start on Thursday, I can be home. Before confirming it, I want to read the written quote. Are you available on Thursday?
What an examiner checks here:
- Will keep the cat indoors too
- Can be home if work starts Thursday
- Wants to read the written quote before confirming
- question: is Thursday available?
Easy to miss: Thursday is proposed and queried; the booking has not yet been confirmed.
Thursday is available, subject to the forecast. I’ll give you the itemised quote now; please check the finish, drainage and access arrangements before accepting it.
Model answer and marking points
پنجشنبه وقت داریم، البته بستگی به پیشبینی هوا داره. الان برآورد قیمت با جزئیات رو بهتون میدم؛ لطفاً قبل از قبول کردنش، نوع پرداخت سطح بتن، زهکشی و ترتیبات رفتوآمد رو بررسی کنین.
What an examiner checks here:
- Thursday is available
- Availability subject to the weather forecast
- Will provide the itemised quote now
- Check the surface finish
- Check drainage and access arrangements
- Checks must happen before accepting the quote
Easy to miss: Thursday’s availability is conditional on the forecast.
ممنون. برآورد رو میخونم و اگه سؤالی داشتم باهاتون تماس میگیرم. لطفاً توش بنویسین که اصلاح شیب هم جزو کاره و اون هفت روز از زمان بتنریزی حساب میشه.
Model answer and marking points
Thank you. I’ll read the quote and contact you if I have any questions. Please put in writing that adjusting the slope is included in the work and that those seven days are counted from when the concrete is poured.
What an examiner checks here:
- Thanks the contractor
- Will read the quote
- Will contact the contractor if there are questions
- Requests written inclusion of slope adjustment in the work
- Requests written confirmation that seven days start from the concrete pour
Easy to miss: Both slope adjustment and the starting point of the seven days must be recorded in writing.
Practise it
Reading a transcript is not interpreting. The practice room on this site plays each segment at native speed, records you, and marks the information you transferred against the same categories examiners use — omissions, distortions, insertions — so you know where the marks went. Your first two full dialogues are marked free.
Start this dialogue →More Persian dialogues
Same topic · Consumer Affairs
Persian CCL: practice test, vocabulary, test dates
How the test works
Continue with the NAATI CCL Persian practice test: 349 dialogues, 174 mock tests.
Practice dialogue written to the CCL specification (two speakers, segments of 35 words or fewer, about 300 words). It is a practice text, not a NAATI test paper, and the AI score is this site's estimate, not a NAATI result. All Persian dialogues · All languages