Correcting a Shop Sign Application Drawing

Persian ↔ EnglishBusiness12 segments ≈320 wordsSegments of 35 words or fewer

English → فارسی

Start this dialogue free →

Business liaison officer (speaking English) and Shop proprietor (speaking Persian) talk through “Correcting a Shop Sign Application Drawing”. You interpret both ways — English into Persian, and Persian into English — one segment at a time, exactly as in the CCL test.

NAATI CCL Persian practice test on naaticcl.com: 349 dialogues and 174 two-dialogue mock tests; transcripts and model answers free to read, plus a free PDF. First two dialogues AI-marked free (no card; email sign-in for the score, out of 45 per dialogue or 90 for a full mock), then A$9 per full mock or from A$19 / 14 days. Updated 6 Nov 2026. Run by PTE Study Pty Ltd (Australia), independent of NAATI. All Persian practice · NAATI CCL Persian mock test online (174 sets) · به فارسی بخوانید · Practice websites compared

Read it first if you like, then practise it cold: the recording plays one segment, you interpret, the next segment plays. Marking shows, segment by segment, what you kept, left out or changed.

Full transcript with model answers

Under each segment: a model interpretation, the information points an examiner checks, and the easiest thing to miss. Try the segment yourself first, then open it. The model is one good way to say it; other wordings that keep every point score just as well.

SEGMENT 1 · ENGLISH · 26 WORDS
Business liaison officer

Let’s check which drawing needs correcting, Mr Farhadi. Your application dated 9 October shows a sign width of 2.4 metres. What does your supplier’s quote show?

Model answer and marking points

آقای فرهادی، بیایید بررسی کنیم کدوم نقشه نیاز به اصلاح داره. توی درخواست شما به تاریخ نهم اکتبر، عرض تابلو ۲٫۴ متر درج شده. توی پیش‌فاکتور تأمین‌کننده‌تون چه عرضی نوشته شده؟

What an examiner checks here:

  • Check which drawing needs correcting with Mr Farhadi
  • Application dated 9 October
  • Application shows sign width of 2.4 metres
  • question: What width does the supplier’s quote show?

Easy to miss: Keep the application’s 2.4-metre width distinct from the width in the supplier’s quote.

SEGMENT 2 · PERSIAN · 28 WORDS
Shop proprietor

توی پیش‌فاکتور عرض تابلو سه متره. فکر کنم اشتباهی نقشهٔ قبلی رو با درخواست نهم اکتبر فرستادم. می‌خوام بدونم چطور می‌تونم اصلاحش کنم.

Model answer and marking points

The quote shows the sign as three metres wide. I think I accidentally sent the old drawing with my application dated 9 October. I’d like to know how I can correct it.

What an examiner checks here:

  • Quote shows sign width of three metres
  • Thinks the old drawing was sent by mistake
  • Old drawing accompanied the application dated 9 October
  • question: How can I correct it?

Easy to miss: The speaker thinks they sent the old drawing; they are not certain.

Your turn — don't read the rest yet. Hear this dialogue at native speed and interpret each segment aloud; AI marks what you kept, left out or changed, segment by segment. Your first two full dialogues are marked free.

Interpret it aloud now →
SEGMENT 3 · ENGLISH · 25 WORDS
Business liaison officer

Before requesting a change, please confirm the width you actually want. Is the three metre sign your preferred design, or has the supplier quoted incorrectly?

Model answer and marking points

قبل از اینکه درخواست تغییر بدید، لطفاً تأیید کنید واقعاً چه عرضی می‌خواید. تابلوی سه‌متری طرح موردنظر خودتونه، یا تأمین‌کننده توی پیش‌فاکتور اشتباه نوشته؟

What an examiner checks here:

  • Confirm the desired width before requesting a change
  • question: Is the three-metre sign the preferred design?
  • question: Has the supplier quoted incorrectly?

Easy to miss: Preserve the two alternatives as a question rather than assuming the supplier made an error.

SEGMENT 4 · PERSIAN · 25 WORDS
Shop proprietor

بله، خودم تابلوی سه‌متری می‌خوام. تأمین‌کننده درست نوشته. هنوز سفارش قطعی ندادم، چون می‌خوام اول تکلیف درخواست روشن بشه.

Model answer and marking points

Yes, I do want a three-metre sign. The supplier has put it down correctly. I haven’t placed a firm order yet because I want to get the application sorted out first.

What an examiner checks here:

  • Wants a three-metre sign
  • Supplier recorded it correctly
  • Has not placed a firm order yet
  • Wants the application sorted out first

Easy to miss: The order has not yet been confirmed, even though the desired width is settled.

SEGMENT 5 · ENGLISH · 27 WORDS
Business liaison officer

Penrith City Council’s assessment team will need consistent information. Ask your supplier for a revised drawing showing the intended width, then identify which earlier drawing it replaces.

Model answer and marking points

گروه بررسی درخواست‌ها در شورای شهر پنریث به اطلاعاتی نیاز داره که با هم مطابقت داشته باشن. از تأمین‌کننده‌تون بخواید نقشهٔ اصلاح‌شده‌ای بده که عرض موردنظرتون رو نشون بده، بعد مشخص کنید این نقشه جایگزین کدوم نقشهٔ قبلی می‌شه.

What an examiner checks here:

  • Penrith City Council’s assessment team needs consistent information
  • Ask the supplier for a revised drawing
  • Revised drawing must show the intended width
  • Identify which earlier drawing it replaces

Easy to miss: The revised drawing must identify the earlier drawing it replaces.

SEGMENT 6 · PERSIAN · 29 WORDS
Shop proprietor

باشه، ازش می‌خوام نقشه رو اصلاح کنه و مشخص کنه جای کدوم نقشه‌ست. می‌شه به همین درخواست اضافه‌ش کنم یا باید درخواست تازه‌ای بدم؟

Model answer and marking points

All right, I’ll ask them to revise the drawing and specify which drawing it replaces. Can I add it to this application, or do I need to submit a new application?

What an examiner checks here:

  • Will ask the supplier to revise the drawing
  • Will ask the supplier to identify which drawing it replaces
  • question: Can it be added to the existing application?
  • question: Is a new application required?

Easy to miss: Keep both application options as a question; neither has been decided.

SEGMENT 7 · ENGLISH · 27 WORDS
Business liaison officer

I can help you ask the assessment team how to submit the correction against your existing application. They will advise whether any further application steps are needed.

Model answer and marking points

می‌تونم کمکتون کنم از گروه بررسی بپرسید چطور باید این اصلاح رو برای درخواست فعلی‌تون ثبت کنید. اون‌ها بهتون می‌گن آیا مراحل دیگه‌ای هم برای درخواست لازمه یا نه.

What an examiner checks here:

  • Can help ask the assessment team
  • Ask how to submit the correction against the existing application
  • Assessment team will advise whether further application steps are needed

Easy to miss: The speaker offers help asking the team and does not confirm that no further steps are needed.

SEGMENT 8 · PERSIAN · 27 WORDS
Shop proprietor

ممنونم. پس اگه نقشهٔ اصلاح‌شده رو قبول کنن، یعنی تابلوی سه‌متری حتماً تأیید می‌شه؟ نصاب منتظره بهش بگم کار رو شروع کنه.

Model answer and marking points

Thank you. So if they accept the revised drawing, does that mean the three-metre sign will definitely be approved? The installer is waiting for me to tell them to start work.

What an examiner checks here:

  • question: If the revised drawing is accepted, is approval of the three-metre sign guaranteed?
  • Question concerns a three-metre sign
  • Installer is waiting for instructions to start work

Easy to miss: Guaranteed approval is being asked about, not stated as a fact.

SEGMENT 9 · ENGLISH · 27 WORDS
Business liaison officer

No, accepting a corrected drawing does not guarantee approval. The assessment team must consider the proposed sign, and I cannot tell you what their decision will be.

Model answer and marking points

نه، پذیرفتن نقشهٔ اصلاح‌شده، تأیید تابلو رو تضمین نمی‌کنه. گروه بررسی باید تابلوی پیشنهادی رو ارزیابی کنه و من نمی‌تونم بهتون بگم تصمیمشون چی خواهد بود.

What an examiner checks here:

  • Accepting a corrected drawing does not guarantee approval
  • Assessment team must consider the proposed sign
  • Speaker cannot predict the team’s decision

Easy to miss: Acceptance of the drawing and approval of the sign are separate decisions.

SEGMENT 10 · PERSIAN · 25 WORDS
Shop proprietor

متوجه شدم. فعلاً به نصاب قول نمی‌دم. پیش‌فاکتور رو هم همراه نقشه بفرستم که معلوم باشه این اختلاف اندازه از کجا اومده؟

Model answer and marking points

I understand. I won’t make any promises to the installer for now. Should I send the quote along with the drawing as well, so it’s clear where the difference in measurements came from?

What an examiner checks here:

  • Understands the explanation
  • Will not make promises to the installer for now
  • question: Should the quote also be sent with the drawing?
  • Quote would explain the source of the measurement discrepancy

Easy to miss: Sending the quote is a question, while withholding promises to the installer is a decision.

SEGMENT 11 · ENGLISH · 25 WORDS
Business liaison officer

Include the supplier’s quote to explain the discrepancy, and clearly label the revised drawing. Keep your application reference handy when you contact the assessment team.

Model answer and marking points

پیش‌فاکتور تأمین‌کننده رو هم ضمیمه کنید تا اختلاف اندازه رو توضیح بده، و نقشهٔ اصلاح‌شده رو واضح برچسب بزنید. وقتی با گروه بررسی تماس می‌گیرید، شمارهٔ پیگیری درخواستتون رو دم دست داشته باشید.

What an examiner checks here:

  • Include the supplier’s quote
  • Quote explains the discrepancy
  • Clearly label the revised drawing
  • Keep the application reference handy when contacting the assessment team

Easy to miss: The application reference is needed when contacting the assessment team.

SEGMENT 12 · PERSIAN · 29 WORDS
Shop proprietor

حتماً. اول نقشهٔ اصلاح‌شده رو می‌گیرم، بعد با شمارهٔ پرونده از گروه بررسی می‌پرسم چطور همراه پیش‌فاکتور ثبتش کنم. برای نصب هم منتظر نتیجه می‌مونم.

Model answer and marking points

Certainly. I’ll get the revised drawing first, then use my application reference to ask the assessment team how to submit it together with the quote. I’ll also wait for the outcome before having the sign installed.

What an examiner checks here:

  • Will obtain the revised drawing first
  • Will then contact the assessment team using the application reference
  • Will ask how to submit the drawing together with the quote
  • Will wait for the outcome before installation

Easy to miss: Preserve the sequence: obtain the drawing, ask how to submit it, and wait for the outcome before installation.

Practise it

Reading a transcript is not interpreting. The practice room on this site plays each segment at native speed, records you, and marks the information you transferred against the same categories examiners use — omissions, distortions, insertions — so you know where the marks went. Your first two full dialogues are marked free.

Start this dialogue →

Get an email when new Persian CCL test dates appear

We check every 2 hours. NAATI updates its list about once a day, so this is not a live seat alert. One email to confirm, then one per change, nothing else. Stop any time in one tap.

More Persian dialogues

Same topic · Business

Persian CCL: practice test, vocabulary, test dates

How the test works

Continue with the NAATI CCL Persian practice test: 349 dialogues, 174 mock tests.

Practice dialogue written to the CCL specification (two speakers, segments of 35 words or fewer, about 300 words). It is a practice text, not a NAATI test paper, and the AI score is this site's estimate, not a NAATI result. All Persian dialogues · All languages