Replacing a Timber Retaining Wall with a Hedge
English → اردو
Your turn: interpret it aloud in the other language.
Start this dialogue free →Landscape designer (speaking English) and Homeowner (speaking Urdu) talk through “Replacing a Timber Retaining Wall with a Hedge”. You interpret both ways — English into Urdu, and Urdu into English — one segment at a time, exactly as in the CCL test.
NAATI CCL Urdu practice test on naaticcl.com: 242 dialogues and 121 two-dialogue mock tests; transcripts and model answers free to read, plus a free PDF. First two dialogues AI-marked free (no card; email sign-in for the score, out of 45 per dialogue or 90 for a full mock), then A$9 per full mock or from A$19 / 14 days. Updated 6 Nov 2026. Run by PTE Study Pty Ltd (Australia), independent of NAATI. All Urdu practice · NAATI CCL Urdu mock test online (121 sets) · اردو میں پڑھیں · Practice websites compared
Read it first if you like, then practise it cold: the recording plays one segment, you interpret, the next segment plays. Marking shows, segment by segment, what you kept, left out or changed.
Full transcript with model answers
Under each segment: a model interpretation, the information points an examiner checks, and the easiest thing to miss. Try the segment yourself first, then open it. The model is one good way to say it; other wordings that keep every point score just as well.
Before we discuss plants, could you tell me what you want to change about the old timber retaining wall at your property in Hornsby?
Model answer and marking points
پودوں کے بارے میں بات کرنے سے پہلے، کیا آپ بتا سکتی ہیں کہ آپ ہارنزبی میں اپنی پراپرٹی پر مٹی کو روکے رکھنے والی لکڑی کی پرانی دیوار میں کیا تبدیلی کرنا چاہتی ہیں؟
What an examiner checks here:
- Before discussing plants
- Property in Hornsby
- Old timber retaining wall
- question: What does the owner want to change about the wall?
Easy to miss: Keep the request as a question and preserve the wall's soil-retaining function.
لکڑی کی پرانی دیوار گل رہی ہے۔ یہ بارہ میٹر لمبی اور ساٹھ سینٹی میٹر اونچی ہے۔ میں اس کی جگہ پودوں کی باڑ لگوانا چاہتی ہوں تاکہ باغ زیادہ ہرا بھرا لگے۔
Model answer and marking points
The old timber wall is rotting. It is twelve metres long and sixty centimetres high. I’d like to replace it with a hedge so the garden looks greener.
What an examiner checks here:
- Old timber wall is rotting
- Twelve metres long
- Sixty centimetres high
- Wants a hedge in place of the wall
- Purpose is to make the garden look greener
Easy to miss: Do not mix up the twelve-metre length and sixty-centimetre height.
Your turn — don't read the rest yet. Hear this dialogue at native speed and interpret each segment aloud; AI marks what you kept, left out or changed, segment by segment. Your first two full dialogues are marked free.
Interpret it aloud now →A hedge can provide privacy, but it cannot hold back soil like a retaining wall. Is the garden bed higher than the path beside it?
Model answer and marking points
پودوں کی باڑ پردہ فراہم کر سکتی ہے، لیکن مٹی کو روکنے والی دیوار کی طرح مٹی کو تھام نہیں سکتی۔ کیا کیاری اس کے ساتھ والے راستے سے اونچی ہے؟
What an examiner checks here:
- Hedge can provide privacy
- Hedge cannot retain soil like a retaining wall
- question: Is the garden bed higher than the adjacent path?
Easy to miss: Preserve the negation: a hedge cannot retain soil like the wall.
جی، کیاری راستے سے اونچی ہے۔ میں سمجھ رہی تھی کہ جڑیں مٹی سنبھال لیں گی۔ تو کیا پودے لگانے کے بعد بھی کچھ دیوار رکھنی پڑے گی؟
Model answer and marking points
Yes, the garden bed is higher than the path. I thought the roots would hold the soil in place. So will we still need to keep some of the wall after planting?
What an examiner checks here:
- Garden bed is higher than the path
- Thought roots would hold the soil in place
- question: Will some wall still need to remain after planting?
Easy to miss: The roots holding the soil is the owner's assumption, not an established fact.
Some retaining structure may still be needed. I would assess the soil and drainage before recommending whether we can replace only the damaged timber sections.
Model answer and marking points
مٹی کو تھامنے کے لیے کسی نہ کسی ڈھانچے کی اب بھی ضرورت پڑ سکتی ہے۔ میں پہلے مٹی اور پانی کی نکاسی کا جائزہ لوں گا، پھر مشورہ دوں گا کہ کیا ہم لکڑی کے صرف خراب حصے بدل سکتے ہیں۔
What an examiner checks here:
- Some retaining structure may still be needed
- Would assess the soil
- Would assess drainage
- Assessment comes before a recommendation
- Whether only damaged timber sections can be replaced
Easy to miss: Replacing only the damaged sections is a possibility to assess, not a confirmed recommendation.
ٹھیک ہے، میں مٹی کھسکنے کا خطرہ نہیں لینا چاہتی۔ اگر کچھ دیوار رکھنی پڑے تو رکھ لیں۔ کیا اس کے ساتھ چوبیس پودے لگ سکتے ہیں؟
Model answer and marking points
All right, I don’t want to risk the soil slipping. If some of the wall needs to stay, we can keep it. Can twenty-four plants be planted alongside it?
What an examiner checks here:
- Does not want to risk soil slipping
- Agrees to keep some wall if necessary
- question: Can twenty-four plants be planted alongside the wall?
Easy to miss: Keeping part of the wall is conditional on it being necessary.
We can consider twenty-four hedge plants along the twelve metres, but suitable spacing depends on the variety. Would you prefer regular trimming or less maintenance?
Model answer and marking points
ہم بارہ میٹر کی لمبائی میں پودوں کی باڑ کے لیے چوبیس پودے لگانے پر غور کر سکتے ہیں، لیکن پودوں کے درمیان مناسب فاصلہ ان کی قسم پر منحصر ہوگا۔ کیا آپ باقاعدگی سے تراش خراش کرنا پسند کریں گی یا کم دیکھ بھال والے پودے چاہیں گی؟
What an examiner checks here:
- Can consider twenty-four hedge plants
- Along twelve metres
- Suitable spacing depends on plant variety
- question: Does the owner prefer regular trimming or less maintenance?
Easy to miss: Twenty-four plants are being considered; the number has not been confirmed as suitable.
میں کام پر جاتی ہوں، اس لیے ایسے پودے چاہتی ہوں جن کی زیادہ دیکھ بھال نہ کرنی پڑے۔ تحریری کوٹیشن میں دیوار، پودوں اور ملبہ اٹھانے کا خرچ الگ الگ بتا دیجیے گا۔
Model answer and marking points
I go to work, so I’d like plants that don’t need much maintenance. Please list the costs of the wall, plants and debris removal separately in the written quote.
What an examiner checks here:
- Owner goes to work
- Wants plants needing little maintenance
- Requests a written quote
- Wall cost listed separately
- Plant cost listed separately
- Debris removal cost listed separately
Easy to miss: The quote must be written and show the three costs separately.
I can prepare an itemised quote covering the retaining work, plants, drainage and waste removal after inspecting the site. Does six May suit your schedule?
Model answer and marking points
جگہ کا معائنہ کرنے کے بعد میں مٹی کو روکنے والی دیوار کے کام، پودوں، پانی کی نکاسی اور ملبہ ہٹانے کے الگ الگ اخراجات کے ساتھ کوٹیشن تیار کر سکتا ہوں۔ کیا چھ مئی آپ کے لیے مناسب رہے گی؟
What an examiner checks here:
- Can prepare an itemised quote after inspecting the site
- Quote includes retaining work
- Quote includes plants
- Quote includes drainage
- Quote includes waste removal
- question: Does six May suit the owner?
Easy to miss: The inspection comes before the quote, which also includes drainage.
چھ مئی کو میں گھر پر ہوں گی۔ میں کام کی منظوری دینے سے پہلے مجوزہ نقشہ بھی دیکھنا چاہتی ہوں۔ کیا آپ مجھے وہ سمجھا دیں گے؟
Model answer and marking points
I’ll be home on six May. I’d also like to see the proposed layout before I approve the work. Will you explain it to me?
What an examiner checks here:
- Will be home on six May
- Wants to see the proposed layout
- Wants to see it before approving the work
- question: Will the contractor explain the layout?
Easy to miss: Being home for the visit does not mean the owner has approved the work.
Certainly. We can review the proposed layout and written quote together before you approve any work. Please keep the side gate accessible for the visit.
Model answer and marking points
ضرور۔ آپ کسی بھی کام کی منظوری دینے سے پہلے ہم مجوزہ نقشہ اور تحریری کوٹیشن مل کر دیکھ سکتے ہیں۔ میرے آنے کے لیے براہِ کرم بغلی دروازے تک راستہ کھلا رکھیے گا۔
What an examiner checks here:
- Agrees to explain the layout
- Can review proposed layout together
- Can review written quote together
- Review occurs before approval of any work
- Requests accessible side gate for the visit
Easy to miss: Keep the side gate accessible; there is no instruction to leave it unlocked.
جی، میں بغلی دروازے تک راستہ صاف رکھوں گی۔ آپ پہلے دیوار دیکھ لیجیے گا، پھر نقشے اور خرچے پر بات کر لیں گے۔ اس کے بعد میں فیصلہ کروں گی۔
Model answer and marking points
Yes, I’ll keep the path to the side gate clear. Please inspect the wall first, then we can discuss the layout and the cost. I’ll make my decision after that.
What an examiner checks here:
- Will keep the path to the side gate clear
- Requests wall inspection first
- Layout discussion follows inspection
- Cost discussion follows inspection
- Will decide after those discussions
Easy to miss: Preserve the sequence: inspect the wall, discuss the layout and cost, then decide.
Practise it
Reading a transcript is not interpreting. The practice room on this site plays each segment at native speed, records you, and marks the information you transferred against the same categories examiners use — omissions, distortions, insertions — so you know where the marks went. Your first two full dialogues are marked free.
Start this dialogue →More Urdu dialogues
Same topic · Consumer Affairs
Urdu CCL: practice test, vocabulary, test dates
How the test works
Continue with the NAATI CCL Urdu practice test: 242 dialogues, 121 mock tests.
Practice dialogue written to the CCL specification (two speakers, segments of 35 words or fewer, about 300 words). It is a practice text, not a NAATI test paper, and the AI score is this site's estimate, not a NAATI result. All Urdu dialogues · All languages