Replacing a Timber Retaining Wall with a Hedge
English → فارسی
Your turn: interpret it aloud in the other language.
Start this dialogue free →Landscape designer (speaking English) and Homeowner (speaking Persian) talk through “Replacing a Timber Retaining Wall with a Hedge”. You interpret both ways — English into Persian, and Persian into English — one segment at a time, exactly as in the CCL test.
NAATI CCL Persian practice test on naaticcl.com: 349 dialogues and 174 two-dialogue mock tests; transcripts and model answers free to read, plus a free PDF. First two dialogues AI-marked free (no card; email sign-in for the score, out of 45 per dialogue or 90 for a full mock), then A$9 per full mock or from A$19 / 14 days. Updated 6 Nov 2026. Run by PTE Study Pty Ltd (Australia), independent of NAATI. All Persian practice · NAATI CCL Persian mock test online (174 sets) · به فارسی بخوانید · Practice websites compared
Read it first if you like, then practise it cold: the recording plays one segment, you interpret, the next segment plays. Marking shows, segment by segment, what you kept, left out or changed.
Full transcript with model answers
Under each segment: a model interpretation, the information points an examiner checks, and the easiest thing to miss. Try the segment yourself first, then open it. The model is one good way to say it; other wordings that keep every point score just as well.
Mr Farhadi, I can help you explore alternatives to your timber wall. Before preparing a quote, could you explain what you want to change in your Hornsby garden?
Model answer and marking points
آقای فرهادی، میتونم کمکتون کنم گزینههای جایگزین دیوار چوبیتون رو بررسی کنیم. قبل از اینکه پیشنهاد قیمت آماده کنم، میشه توضیح بدید چه تغییراتی میخواید توی باغچهتون در هورنزبی بدید؟
What an examiner checks here:
- Mr Farhadi addressed
- Help exploring alternatives to the timber wall
- Before preparing a quote
- question: What changes do you want in your Hornsby garden?
Easy to miss: The speaker asks about the desired changes before preparing a quote.
میخوام دیوار چوبی قدیمی رو بردارم و جاش پرچین بکارم. دیوار دوازده متر طول و شصت سانتیمتر ارتفاع داره. ترجیحم اینه که باغچه طبیعیتر به نظر بیاد.
Model answer and marking points
I want to remove the old timber wall and plant a hedge in its place. The wall is twelve metres long and sixty centimetres high. I’d prefer the garden to look more natural.
What an examiner checks here:
- Remove the old timber wall
- Plant a hedge in its place
- Wall length: 12 metres
- Wall height: 60 centimetres
- Preference for a more natural-looking garden
Easy to miss: Keep the length of 12 metres separate from the height of 60 centimetres.
Your turn — don't read the rest yet. Hear this dialogue at native speed and interpret each segment aloud; AI marks what you kept, left out or changed, segment by segment. Your first two full dialogues are marked free.
Interpret it aloud now →A hedge can provide privacy, but its roots cannot immediately replace a retaining wall. Is the ground behind your wall higher than the lawn in front?
Model answer and marking points
پرچین میتونه جلوی دید رو بگیره، ولی ریشههاش نمیتونن بلافاصله جای دیوار حائل رو بگیرن. آیا سطح زمین پشت دیوارتون از چمن جلوی اون بالاتره؟
What an examiner checks here:
- A hedge can provide privacy
- Its roots cannot immediately replace a retaining wall
- question: Is the ground behind the wall higher than the lawn in front?
Easy to miss: The roots cannot replace the retaining wall immediately.
بله، خاک پشت دیوار از چمن جلوی اون بالاتره. وقتی بارون میاد، آب هم پشتش جمع میشه. اگه مجبور باشیم یه دیوار نگه داریم، میشه کوتاهترش کنیم؟
Model answer and marking points
Yes, the soil behind the wall is higher than the lawn in front of it. Water also collects behind it when it rains. If we have to keep a wall, can we make it lower?
What an examiner checks here:
- Soil behind the wall is higher than the lawn in front
- Water collects behind the wall when it rains
- Condition: if a wall must be kept
- question: Can the wall be made lower?
Easy to miss: Making the wall lower is a question conditional on having to keep a wall.
We may need to keep a low retaining wall and plant the hedge behind it. I would need to inspect the slope and drainage before recommending anything.
Model answer and marking points
ممکنه لازم باشه یه دیوار حائل کوتاه نگه داریم و پرچین رو پشتش بکاریم. قبل از اینکه پیشنهادی بدم، باید شیب زمین و وضعیت زهکشی رو بررسی کنم.
What an examiner checks here:
- May need to keep a low retaining wall
- Plant the hedge behind the wall
- Inspect the slope
- Inspect drainage
- Inspection required before making a recommendation
Easy to miss: Keeping a low wall is a possibility, and the hedge would go behind it.
باشه، اول بررسی کنید. من برای پرچین بیستوچهار تا بوته در نظر گرفته بودم. هزینهٔ جمع کردن و بردن چوبهای قدیمی هم توی قیمت پیشنهادی حساب میشه؟
Model answer and marking points
All right, inspect it first. I’d been planning on twenty-four plants for the hedge. Will the quote also include the cost of collecting and taking away the old timber?
What an examiner checks here:
- Agreement to inspect first
- 24 plants planned for the hedge
- question: Does the quote include collecting and taking away the old timber?
Easy to miss: The removal cost is being asked about, not confirmed as included.
I can price 24 hedge plants separately from any wall repairs. The written quote will also list labour, soil preparation, drainage work and removal of old timber.
Model answer and marking points
میتونم قیمت ۲۴ بوتهٔ پرچین رو جدا از هرگونه تعمیر دیوار حساب کنم. توی پیشنهاد قیمت کتبی، هزینهٔ دستمزد، آمادهسازی خاک، کارهای زهکشی و جمعآوری و بردن چوبهای قدیمی هم جدا ذکر میشه.
What an examiner checks here:
- 24 hedge plants priced separately from any wall repairs
- Written quote
- Labour listed
- Soil preparation listed
- Drainage work listed
- Old timber removal listed
Easy to miss: The hedge plants are priced separately from wall repairs, not from replacing the whole wall.
خوبه، لطفاً هزینهٔ هر بخش رو جدا بنویسید تا بتونم مقایسه کنم. برای بازدید چه روزی وقت دارید؟ خود بازدید هم هزینه داره؟
Model answer and marking points
Good. Please list the cost of each part separately so I can compare them. What day are you available for an inspection? Is there a charge for the inspection itself?
What an examiner checks here:
- List each part’s cost separately
- Separate costs needed for comparison
- question: What day are you available for an inspection?
- question: Is there a charge for the inspection itself?
Easy to miss: There are two questions: availability and whether the inspection costs anything.
Would a site visit on 6 May suit you? There is no charge for this visit, and we will confirm the appointment time by phone.
Model answer and marking points
ششم مه برای بازدید از محل براتون مناسبه؟ این بازدید هزینهای نداره و ساعت قرار رو تلفنی باهاتون قطعی میکنیم.
What an examiner checks here:
- question: Would a site visit on 6 May suit you?
- No charge for this visit
- Appointment time to be confirmed by phone
Easy to miss: The visit is free, and its time still needs to be confirmed by phone.
ششم مه مناسبه، ولی فقط صبح خونهام. لطفاً قبلش ساعت رو بهم خبر بدید. میخوام اول قیمت رو ببینم و بعد تصمیم بگیرم.
Model answer and marking points
The sixth of May suits me, but I’m only home in the morning. Please let me know the time beforehand. I want to see the quote first and then decide.
What an examiner checks here:
- 6 May is suitable
- Only home in the morning
- Notify the appointment time beforehand
- See the quote before deciding
Easy to miss: Morning is the only time the speaker will be home, not merely a preference.
I have noted your preference for a morning visit. You can review the quote first; we will only schedule construction after you accept it in writing.
Model answer and marking points
یادداشت کردم که ترجیح میدید بازدید صبح باشه. میتونید اول پیشنهاد قیمت رو بررسی کنید؛ فقط بعد از اینکه بهصورت کتبی قبولش کردید، برای اجرای کار زمان تعیین میکنیم.
What an examiner checks here:
- Morning visit preference noted
- Quote can be reviewed first
- Construction scheduled only after acceptance
- Acceptance must be in writing
Easy to miss: Construction is scheduled only after written acceptance of the quote.
خیلی خوبه. موقع بازدید دربارهٔ جنس دیوار کوتاه و نوع بوتهها هم صحبت کنیم. میخوام بدونم هر کدوم چقدر نگهداری لازم دارن، بعد قیمت پیشنهادی رو بررسی میکنم.
Model answer and marking points
That sounds very good. Let’s also discuss the material for the low wall and the types of plants during the visit. I want to know how much maintenance each will need, and then I’ll review the quote.
What an examiner checks here:
- Discuss the low wall’s material during the visit
- Discuss plant types during the visit
- Wants to know maintenance requirements for each
- Review the quote afterwards
Easy to miss: The speaker wants maintenance information about both the wall and the plants before reviewing the quote.
Practise it
Reading a transcript is not interpreting. The practice room on this site plays each segment at native speed, records you, and marks the information you transferred against the same categories examiners use — omissions, distortions, insertions — so you know where the marks went. Your first two full dialogues are marked free.
Start this dialogue →More Persian dialogues
Same topic · Consumer Affairs
Persian CCL: practice test, vocabulary, test dates
How the test works
Continue with the NAATI CCL Persian practice test: 349 dialogues, 174 mock tests.
Practice dialogue written to the CCL specification (two speakers, segments of 35 words or fewer, about 300 words). It is a practice text, not a NAATI test paper, and the AI score is this site's estimate, not a NAATI result. All Persian dialogues · All languages