Replacing a Cracked Concrete Driveway
English → العربية
Your turn: interpret it aloud in the other language.
Start this dialogue free →Estimator (speaking English) and Homeowner (speaking Arabic) talk through “Replacing a Cracked Concrete Driveway”. You interpret both ways — English into Arabic, and Arabic into English — one segment at a time, exactly as in the CCL test.
NAATI CCL Arabic practice test on naaticcl.com: 343 dialogues and 171 two-dialogue mock tests; transcripts and model answers free to read, plus a free PDF. First two dialogues AI-marked free (no card; email sign-in for the score, out of 45 per dialogue or 90 for a full mock), then A$9 per full mock or from A$19 / 14 days. Updated 6 Nov 2026. Run by PTE Study Pty Ltd (Australia), independent of NAATI. All Arabic practice · NAATI CCL Arabic mock test online (171 sets) · اقرأ بالعربية · Practice websites compared
Read it first if you like, then practise it cold: the recording plays one segment, you interpret, the next segment plays. Marking shows, segment by segment, what you kept, left out or changed.
Full transcript with model answers
Under each segment: a model interpretation, the information points an examiner checks, and the easiest thing to miss. Try the segment yourself first, then open it. The model is one good way to say it; other wordings that keep every point score just as well.
For your Bankstown property, I've measured the cracked driveway at forty-five square metres. Before preparing the quote, what matters most to you about the replacement?
Model answer and marking points
بالنسبة لعقارك في بانكستاون، قست مساحة مدخل السيارات المتشقق، وهي خمسة وأربعون متراً مربعاً. قبل ما أجهز عرض السعر، ما أهم شيء بالنسبة لك في استبدال المدخل؟
What an examiner checks here:
- Property in Bankstown
- Cracked driveway measured at 45 square metres
- Quote not yet prepared
- question: What matters most about the replacement?
Easy to miss: The measurement is 45 square metres, not 45 metres.
أنا محتاج سطح ما يكون زلق لما ينزل المطر، ويكون شكله بسيط. ما عندي مشكلة بالخرسانة، بس حاب أعرف الخيارات قبل ما أقرر.
Model answer and marking points
I need a surface that isn't slippery when it rains and has a simple look. I'm fine with concrete, but I'd like to know the options before I decide.
What an examiner checks here:
- Needs a surface that is not slippery in rain
- Wants a simple appearance
- Concrete is acceptable
- Wants to know the options before deciding
Easy to miss: The speaker accepts concrete but has not yet made a final decision.
Your turn — don't read the rest yet. Hear this dialogue at native speed and interpret each segment aloud; AI marks what you kept, left out or changed, segment by segment. Your first two full dialogues are marked free.
Interpret it aloud now →Both plain concrete and exposed aggregate are options. Aggregate has a textured finish, but costs more. Would you prefer a quote for plain concrete with a broom finish?
Model answer and marking points
في خيار الخرسانة العادية وخيار الخرسانة ذات الحصى المكشوف. الخرسانة ذات الحصى المكشوف سطحها خشن، بس تكلفتها أعلى. هل تفضّل أجهز لك عرض سعر للخرسانة العادية بتشطيب بالمكنسة؟
What an examiner checks here:
- Plain concrete and exposed aggregate are both options
- Exposed aggregate has a textured finish
- Exposed aggregate costs more
- question: Would you prefer a quote for plain concrete with a broom finish?
Easy to miss: Exposed aggregate and plain concrete with a broom finish are different options.
نعم، خلينا على الخرسانة بتشطيب خشن بالمكنسة. ممكن توضحي لي السعر الكامل، وهل يشمل تكسير الخرسانة القديمة ونقلها وتجهيز الأرض؟
Model answer and marking points
Yes, let's go with concrete with a rough broom finish. Could you explain the total price and whether it includes breaking up the old concrete, taking it away and preparing the ground?
What an examiner checks here:
- Chooses concrete with a rough broom finish
- question: What is the total price?
- question: Does it include breaking up the old concrete?
- question: Does it include taking the old concrete away?
- question: Does it include ground preparation?
Easy to miss: Keep the questions about what the price includes as questions.
That option comes to $6,800 for the forty-five square metres, including removal, disposal, and ground preparation. Any additional work would need your approval before we proceed.
Model answer and marking points
هذا الخيار تكلفته ستة آلاف وثمانمئة دولار لمساحة خمسة وأربعين متراً مربعاً، ويشمل إزالة الخرسانة القديمة والتخلص منها وتجهيز الأرض. وأي شغل إضافي لازم نأخذ موافقتك عليه قبل ما نبدأ فيه.
What an examiner checks here:
- Total price is $6,800
- Price covers 45 square metres
- Includes removal
- Includes disposal
- Includes ground preparation
- Additional work requires the customer's approval before proceeding
Easy to miss: The $6,800 is the total for 45 square metres, not a price per square metre.
ستة آلاف وثمانمئة دولار مبلغ مناسب لميزانيتي. بس حاليا المي بتتجمع قدام الكراج لما تمطر. ممكن تعالجي هالمشكلة وتذكري الحل في عرض السعر؟
Model answer and marking points
Six thousand eight hundred dollars is within my budget. But at the moment, water pools in front of the garage when it rains. Could you fix this problem and include the solution in the quote?
What an examiner checks here:
- $6,800 is within budget
- Water currently pools in front of the garage when it rains
- question: Can you fix the water pooling problem?
- question: Can you include the solution in the quote?
Easy to miss: The water pools in front of the garage, not inside it.
We can adjust the driveway's slope to direct water away from the garage. I'll specify that in the written quote, along with the finish and inclusions.
Model answer and marking points
نقدر نعدّل ميل مدخل السيارات عشان نوجّه المي بعيداً عن الكراج. رح أذكر هذا في عرض السعر المكتوب، مع نوع التشطيب والأعمال المشمولة بالسعر.
What an examiner checks here:
- Can adjust the driveway's slope
- Slope adjustment directs water away from the garage
- Will specify the drainage solution in the written quote
- Written quote will specify the finish
- Written quote will specify inclusions
Easy to miss: The slope must direct water away from the garage.
ممتاز، هيك بكون مطمئن إن التفاصيل واضحة. قديش بتحتاجوا وقت للشغل؟ وهل بقدر أدخل السيارة بالليل بعد ما تخلصوا شغلكم كل يوم؟
Model answer and marking points
Great, that reassures me that the details will be clear. How long will you need for the work? And can I drive the car in at night after you finish work each day?
What an examiner checks here:
- Reassured that the details will be clear
- question: How long will the work take?
- question: Can the car be driven in at night after work finishes each day?
Easy to miss: The customer asks about car access each night, not only after the whole job is finished.
The work takes three days, but there will be no car access for seven days from the start. You'll need to arrange parking elsewhere during that period.
Model answer and marking points
الشغل بياخد ثلاثة أيام، بس ما رح تقدر تدخل السيارة لمدة سبعة أيام من بداية الشغل. لازم ترتّب موقف للسيارة في مكان ثاني خلال هالفترة.
What an examiner checks here:
- Work takes three days
- No car access for seven days
- Seven days counted from the start of the work
- Must arrange parking elsewhere during that period
Easy to miss: The seven days start when the work begins, not after the three days of work.
يعني الشغل ثلاثة أيام، بس السيارة بتضل برا سبعة أيام من البداية. ممكن أوقف عند جاري بعد ما آخذ موافقته. بتقدروا تبدؤوا الأربعاء؟ وإذا مطرت، شو بصير؟
Model answer and marking points
So the work takes three days, but the car has to stay out for seven days from the start. I could park at my neighbour's after getting his permission. Can you start on Wednesday? And what happens if it rains?
What an examiner checks here:
- Work takes three days
- Car must stay out for seven days from the start
- May park at the neighbour's
- Neighbour's permission must be obtained first
- question: Can you start on Wednesday?
- question: What happens if it rains?
Easy to miss: Parking at the neighbour's is conditional on getting permission.
Wednesday is available, weather permitting. If rain affects the work, we'll discuss a revised schedule. Please review the written quote before confirming your booking.
Model answer and marking points
يوم الأربعاء متاح، إذا سمح الطقس. إذا أثّر المطر على الشغل، رح نناقش جدولاً معدّلاً. يُرجى مراجعة عرض السعر المكتوب قبل تأكيد الحجز.
What an examiner checks here:
- Wednesday is available
- Wednesday start is subject to weather
- If rain affects the work, a revised schedule will be discussed
- Must review the written quote before confirming the booking
Easy to miss: Wednesday is conditional on the weather, and the booking is not yet confirmed.
تمام، رح أراجع العرض وأتأكد إن مدة منع دخول السيارة سبعة أيام مذكورة فيه. إذا كل التفاصيل واضحة، بتواصل مع المكتب لتأكيد الحجز.
Model answer and marking points
Okay, I'll review the quote and make sure it states that there will be no car access for seven days. If all the details are clear, I'll contact the office to confirm the booking.
What an examiner checks here:
- Will review the quote
- Will check that seven days without car access is stated
- Will contact the office if all details are clear
- Contact is to confirm the booking
Easy to miss: The customer will confirm the booking only if all the details are clear.
Practise it
Reading a transcript is not interpreting. The practice room on this site plays each segment at native speed, records you, and marks the information you transferred against the same categories examiners use — omissions, distortions, insertions — so you know where the marks went. Your first two full dialogues are marked free.
Start this dialogue →More Arabic dialogues
Same topic · Consumer Affairs
Arabic CCL: practice test, vocabulary, test dates
How the test works
Continue with the NAATI CCL Arabic practice test: 343 dialogues, 171 mock tests.
Practice dialogue written to the CCL specification (two speakers, segments of 35 words or fewer, about 300 words). It is a practice text, not a NAATI test paper, and the AI score is this site's estimate, not a NAATI result. All Arabic dialogues · All languages